menu +

Projects:


Bangkok RAMA VIII Bridge, Thailand
Client: H.E. Sheikh Saoud Bin Mohammed Bin Ali Al Thani (Former Minister of Culture)
Construction Period: 48 months
Description: Single pylon steel structure concrete composite cable-stayed bridge. Main bridge 475m Long and 29.3m wide, main tower 175m high.
Contract Value: USD 78 million
*High Quality Prize of Thailand


TOP